Skip to main content
Start Point

Guide

A practical guide to planning your exhibition booth in Saudi Arabia

A working timeline for KSA exhibition planning — what to brief when, what kills your timeline, and how to spot a contractor about to slip.

Start Point Studio · 2026-04-12 · 9 min read

A practical guide to planning your exhibition booth in Saudi Arabia

In short

For a hero stand above 200 m², brief your contractor 10-12 weeks before move-in. Lock concept by week 3, drawings by week 5, fabrication by week 9, install in the last week. The single largest cause of show-day snags is late artwork.

Full guide copy will live here. This page renders the guide shell, hero, schema, and TL;DR — body to be authored.

Start a project

Got a project the guide applies to?